• Technology
      • Back
      • Principles of Operation
      • Advantages
      • Animations
  • Applications
      • Back
      • Activated Sludge Treatment
      • Aeration
      • Aerobic Digesters
      • Anaerobic Digesters
      • Anoxic and Surge Tank Mixing
      • Blending
      • Equalization Tank
      • Intense Mixing for pH Control
      • Oxygen Transfer
      • pH Neutralization
      • Sludge Mixing
      • Sludge Treatment
      • Solid Suspension
  • Installations
  • Clients
  • Videos
  • Photos
  • PDF Resources
  • Happenings
  • Contact Us

Backflush during start-up process. It normally takes one minute to start up the backflush system. The recommended duration of operation is ten minutes. It is usually recommended to use the backflush once every month.

We have an animation video of this process: https://youtu.be/z-wzZFixq4Q

  • Technology
    • Principles of Operation
    • Advantages
    • Animations
  • Applications
    • Activated Sludge Treatment
    • Aeration
    • Aerobic Digesters
    • Anaerobic Digesters
    • Anoxic and Surge Tank Mixing
    • Blending
    • Equalization Tank
    • Intense Mixing for pH Control
    • Oxygen Transfer
    • pH Neutralization
    • Sludge Mixing
    • Sludge Treatment
    • Solid Suspension
  • Installations
  • Clients
  • Videos
  • Photos
  • PDF Resources
  • Happenings
  • Contact Us

MIXING SYSTEMS, INC. · 7058 Corporate Way, Dayton, OH 45459, USA
Contact Prakash R. Bathija at: 937-435-7227
Email: mixing@mixing.com
Copyright © 2022. Mixing Systems, Inc.

linkedinyoutube

Back to top